Charlotte Douglas Airport Temporarily Closes Runway 5/23 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Sep 07, 2016

Charlotte Douglas Airport Temporarily Closes Runway 5/23

Airfield Improvements Scheduled To Begin

Runway 5/23 at Charlotte Douglas International Airport will be temporarily closed through November 19 for maintenance-related activities. During this time, the FAA will replace and update the runway’s navigational aids, and the Airport will resurface Taxiway ”C”, which intersects the runway. KCLT and the FAA are conducting this work to ensure continued safety of the airfield.

Runway 5/23 is the Airport’s preferred nighttime noise abatement runway. This change will increase air traffic between the hours of 11 p.m. and 7 a.m. over communities that presently do not receive many overflights during those hours.
 
The temporary closure of Runway 5/23 also will require certain changes to the Airport’s daytime arrival and departure procedures during a south operation. Currently when the Airport is in a south operation, aircraft arrive on Runway 5/23 and depart on Runway 18L/36R. As a result, communities north of Runway 18L/36R experience relatively little air traffic.

With the temporary closure of Runway 5/23, the FAA will use Runway 18L/36R during the day for both arrivals and departures to accommodate operational demand. Communities north of this runway will experience a corresponding increase in aircraft overflights.

In addition to the temporary closure of Runway 5/23, two other airfield projects will take place during the 2 ½ month construction window:

  • Runway 18L/36R will be closed each night to resurface Taxiway “C.”  This closure is for safety during the nighttime work hours.
  • Runway 18C/36C will be shut down each night from 11 p.m. to 5:30 a.m. for crews to repaint pavement markings.

These additional temporary runway closures will cause nighttime flight operations to use Runway 18R/36L, which is a change from the Airport’s normal procedures. Communities north and south of this runway will experience a corresponding increase in aircraft operations during a timeframe in which they rarely receive overflights.

(Source: Charlotte Douglas International Airport news release)

FMI: www.ctlairport.com

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC