FAA Proposes AD For Some GE CF34-8C And CF34-8E Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Dec 15, 2012

FAA Proposes AD For Some GE CF34-8C And CF34-8E Engines

Two Instances Of Engine Fires Prompted The Move

The FAA posted a proposed AD in the Federal Register Thursday for all General Electric Company (GE) CF34-8C and CF34-8E turbofan engines with certain part numbers (P/N) of operability bleed valves (OBV) installed. This proposed AD was prompted by three failure events of ring lock fuel  fittings on the OBV. Two of those events led to an engine fire. This  proposed AD would require the affected OBVs be removed from service and  replaced with OBVs eligible for installation. The FAA is proposing this AD  to prevent failure of OBV ring lock fuel fittings, engine fuel leakage, uncontrolled fire, and damage to the airplane.

The agency received reports of three failure events of OBV ring lock fuel fittings on GE CF34-8C turbofan engines. Two of those events led to an engine fire. Investigation revealed that the ring lock fittings failed due to fatigue caused by improper broaching of the OBV housing during manufacture, and, improper installation of the ring lock fittings during OBV assembly. GE CF34-8E turbofan engines also use the affected OBVs and would be affected by this proposed AD.

The FAA says that this condition, if not corrected, could result in failure of OBV ring lock fuel fittings, engine fuel leakage, uncontrolled fire, and damage to the airplane.

The repairs are expected to affect some 300 engines installed on Embraer and Bombardier airplanes of U.S. registry. The FAA estimates that it would take about two hours per engine to perform the actions required by this proposed AD, and that the average labor rate is $85 per hour. Required parts would cost about $25,000 per engine. Based on these figures, we estimate the total cost of the proposed AD to U.S. operators to be $7,551,000.

Comments on the proposed AD are due to the FAA by February 11, 2013.

FMI: Proposed AD

Advertisement

More News

ANN's Daily Aero-Linx (04.15.24)

Aero Linx: International Flying Farmers IFF is a not-for-profit organization started in 1944 by farmers who were also private pilots. We have members all across the United States a>[...]

Classic Aero-TV: 'No Other Options' -- The Israeli Air Force's Danny Shapira

From 2017 (YouTube Version): Remembrances Of An Israeli Air Force Test Pilot Early in 2016, ANN contributor Maxine Scheer traveled to Israel, where she had the opportunity to sit d>[...]

Aero-News: Quote of the Day (04.15.24)

"We renegotiated what our debt restructuring is on a lot of our debts, mostly with the family. Those debts are going to be converted into equity..." Source: Excerpts from a short v>[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.16.24): Chart Supplement US

Chart Supplement US A flight information publication designed for use with appropriate IFR or VFR charts which contains data on all airports, seaplane bases, and heliports open to >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC