Gulfstream Expands Savannah R&D Campus | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.09.24

Airborne-Unlimited-04.10.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Jan 18, 2011

Gulfstream Expands Savannah R&D Campus

New Facility Provides Office, Lab, Light Manufacturing And Warehouse Space

Gulfstream recently purchased a building off Lummus Drive in Savannah, GA to house the aircraft manufacturer's growing research and development program. The acquisition of the 253,000-square-foot facility is part of an expansion plan Gulfstream announced on Nov. 15, 2010, which includes building new facilities at the northwest quadrant of the Savannah/Hilton Head International Airport, renovating several existing facilities on the main campus off Gulfstream Road and expanding office and lab facilities at the Gulfstream Research and Development Center.

"Gulfstream recognizes the strategic importance of research and development," said Pres Henne, senior vice president, Programs, Engineering and Test, Gulfstream. "This expansion will enable us to explore new technologies that further enhance aircraft safety, reliability, dependability and efficiency for our customers."

Gulfstream purchased the building from the Lummus Corp. in late December. It is currently undergoing the first of two planned renovations, which should be complete in February.  The second renovation is slated to start in April and is scheduled for completion in 2012.

Located on 49.2 acres, the facility includes approximately 30,000 square feet of office space, approximately 223,000 square feet of light manufacturing and warehouse space, and the potential for additional office, lab and warehouse development.

Gulfstream's Research and Development campus consists of three different phases and is home to approximately 1,450 employees.  Research and Development Center I (RDC I) opened in March 2006 and accommodates some 750 technical and engineering employees.  RDC II has two buildings: a 108,750-square-foot office building and an 80,500-square-foot laboratory building. The office building accommodates 550 employees from engineering and its supporting groups. In addition to research- and development-related equipment, the laboratory building houses some 150 engineering and support employees.

FMI: www.gulfstream.com

Advertisement

More News

ANN's Daily Aero-Linx (04.13.24)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

ANN's Daily Aero-Term (04.13.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC