Boeing Increases Dreamliner Production Rate | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.09.24

Airborne-Unlimited-04.10.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Nov 13, 2012

Boeing Increases Dreamliner Production Rate

Now Rolling Off The Assembly Line At Five Airplanes Per Month

Boeing has rolled out the first 787 Dreamliner built at the new rate of five airplanes per month. The airplane is the 83rd 787 to be built. Earlier this year, the planemaker increased the rate from 2.5 to 3.5 airplanes per month, and is on track to achieve a planned 10-per-month rate by late 2013. The program production rate accounts for airplanes built at Boeing South Carolina and Everett, including the Temporary Surge Line that was activated earlier this year in Everett.

"This accomplishment, doubling our production rate in one year, is the result of the combined efforts of thousands of men and women across Boeing and at our partners," said Larry Loftis, vice president and general manager of the 787 program. "The entire 787 team is focused on meeting our commitments. They've gotten even smarter in how they build this airplane and applied real ingenuity in making our processes and tools more efficient."

Boeing employees are using teamwork and new technologies to meet production rate increases. Approximately 500 employee involvement teams are actively pursuing improvement efforts across the program. Teams are led by employees working to find ways to improve efficiency, quality, safety and growth.
 
As just one example illustrative of the efforts happening across the production system, a team developed a small piece of protective equipment to cover the electronic actuators that help move the horizontal stabilizer. The plastic covering is now used across the program to protect the actuators during the production process. In addition, this small change has resulted in quicker production completion times.
 
"The work our teams are doing to continuously improve is making this program more efficient," added Loftis. "Their commitment to doing the job with high quality and making improvements to the system is outstanding."
 
Among the new tools being deployed to improve productivity in the Final Assembly areas are Orbital Drilling machines. The machines are used to drill holes to attach the wings to the center fuselage section of the airplane. The drilling technique is unique in that the cutter rotates in a circular motion to carve out the hole, rather than a conventional drill that cuts straight into the material. Benefits of the machines include improved precision and time savings for mechanics. A third benefit is improved safety as the machines require lower thrust and torque.

(Images provided by Boeing)

FMI: www.boeing.com


Advertisement

More News

ANN's Daily Aero-Linx (04.13.24)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

ANN's Daily Aero-Term (04.13.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC