AD: Airbus | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** AIRBORNE 05.24.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.24.13 **

** AIRBORNE 05.21.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.21.13 **

** AIRBORNE 04.01.13 SPECIAL EDITION of Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 04.01.13 SPECIAL EDITION **

Sun, Apr 24, 2011

AD: Airbus

AD NUMBER: 2011-08-05

MANUFACTURER: Airbus Model A310 Series Airplanes; and Model A300 B4-600, A300 B4-600R, A300 F4-600R Series Airplanes, and Model A300 C4-605R Variant F Airplanes (Collectively Called A300-600 Series Airplanes)
SUBJECT: Airworthiness Directive 2011-08-05

SUMMARY: This AD results from mandatory continuing airworthiness information (MCAI) originated by an aviation authority of another country to identify and correct an unsafe condition on an aviation product. The MCAI describes the unsafe condition as:

The ball screw nut assemblies of the first 70 Trimmable Horizontal Stabilizer Actuators (THSA) manufactured by Goodrich were fitted with an upper attachment gimbal having a thickness of 58 mm (2.28 in), which is different from the design of the final production standard. The gimbal installed on the subsequent THSAs (final production standard) is more robust, having a thickness of 70mm (2.76 in).

During the fatigue life demonstration of the THSA upper attachment primary load path elements, only a gimbal having a thickness of 70mm (2.76 in) was used. Thereafter, no additional justification work to demonstrate the robustness of the upper attachment fitted with a gimbal of 58 mm was accomplished. In case of failure of this gimbal, the THSA upper attachment primary load path would be lost and the THSA upper attachment secondary load path would engage.

Because the upper attachment secondary load path will only withstand the loads for a limited period of time, the condition where it would be engaged and not detected could lead to failure of the secondary load path, which would likely result in loss of control of the airplane.

FMI: http://rgl.faa.gov/Regulatory_and_Guidance_Library/rgAD.nsf/0/4A83EE30CAAE6375862578790051C638?OpenDocument

Advertisement

More News

ANN's Daily Aero-Linx (05.24.13)

Stormbirds A confederation of Luftwaffe-related web sites, providing reference-grade coverage of the Messerschmidt 262 and other advanced combat aircraft of the Third Reich.>[...]

ANN's Daily Aero-Term (05.24.13): Terrain/Obstruction Alert

A safety alert issued by ATC to aircraft under their control if ATC is aware the aircraft is at an altitude which, in the controller's judgment, places the aircraft in unsafe proxi>[...]

Aero-News: Quote Of The Day (05.24.13)

"You have a huge job ahead of you. The challenges are many and the solutions are hard." Source: Senate Commerce Committee Chair Jay Rockefeller (D-WV).>[...]

ANN FAQ: ANN's News Portal Syndication Program

Get A Customized ANN News Portal For YOUR Website! As we promised, the ever-so-busy software geeks at ANN have been working overtime on a number of cool new tools and toys... and t>[...]

AF Seven Summits Team Scales Everest

Effort To Raise Funds And Awareness For The Special Operations Warrior Foundation A group of Airmen with the Air Force Seven Summits team reached the highest point of the world, Mo>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2013 Web Development & Design by Pauli Systems, LC