Boeing Celebrates Grand Opening Of 777X Composite Wing Center | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, May 24, 2016

Boeing Celebrates Grand Opening Of 777X Composite Wing Center

Investment Of More Than $1 Billion Sustains Thousands Of Puget Sound Jobs

Boeing employees recently joined with community leaders from across the region to celebrate the grand opening of its new 777X Composite Wing Center (CWC) in Everett, WA.

The facility, located on the north side of the main final assembly building, will manufacture the world's largest composite wings for the 777X, the company's newest commercial jetliner, and sustain thousands of Puget Sound area jobs.

Boeing has invested more than $1 billion in the Everett site for construction and outfitting of the new building. "[This] event is bigger than celebrating the opening of a magnificent new building," said Boeing Commercial Airplanes President and CEO Ray Conner. "It's about our employees, and shared success with our partners around the region and in Olympia in keeping the Puget Sound at the forefront of aerospace leadership for decades to come."

Construction of the new CWC building required approximately 4.2 million hours of construction time. At its peak, 1,700 contract employees worked on the project. By the numbers, the new building required:

  • 31,000 tons of steel with the highest beams weighing 720 pounds per foot.
  • 480 miles of electrical cable.
  • 80,000 linear feet of process piping.
  • 170,000 cubic yards of concrete were poured. The concrete was brought to the site by more than 16,500 truckload deliveries.

The CWC is more than 27 acres under one roof – the equivalent to 24 football fields. It will contain three of the world's largest autoclaves – each big enough to fit two Boeing 737 fuselages inside.

To date, the 777X has accumulated 320 orders and commitments from six customers worldwide. Production of the 777X is scheduled to begin in 2017, with first delivery targeted in 2020.

(Source: Boeing news release. Images from file)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC