Army Officials: No Scout Helo RFP Before 2014 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.09.24

Airborne-Unlimited-04.10.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Jan 12, 2013

Army Officials: No Scout Helo RFP Before 2014

Industry Has Been Performing Demonstrations Flights Since Last Year

While helicopter companies have been wooing U.S. Army officials with demonstration flights of potential replacements to the Kiowa Warrior scout aircraft, Army officials now say the earliest they could issue an RFP for the aircraft is the summer of 2014.

Just before the Association of the United States Army's aviation symposium at National Harbor, MD, this week, Col. John Lynch, capability manager for the Army's Training and Doctrine Command, told reporters that Vice Chief of Staff Gen. Lloyd Austin said he needs more details about the potential competitors. "We got sent back with more homework to do," Lynch said of a meeting with Austin just before Christmas.

The blog National Defense reports that the Army has even delayed a decision on whether to hold a competition until this summer. While the aircraft that participated in the voluntary demonstration program last year were all deemed to be better than the existing technology, "everything ... is conventional technology," Lynch said. Companies that are mentioned as potential competitors are Bell, EADS, Sikorsky, and AgustaWestland.

The Army says it will eventually replace all of its helicopters as part of its Future Vertical Lift program, which has a goal of flying a new aircraft by 2030. But officials say that is a long time to fly an aircraft like the Kiowa Warrior. The Army has tried twice in the past to replace the helo, but both times the programs were canceled due to delays and cost overruns.

(Kiowa Warrior pictured in file photo)

FMI: www.army.mil

Advertisement

More News

ANN's Daily Aero-Linx (04.13.24)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

ANN's Daily Aero-Term (04.13.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC