Shuttle Crew Checks Out Equipment For Return To Flight Mission | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Mar 22, 2005

Shuttle Crew Checks Out Equipment For Return To Flight Mission

The astronauts of the Space Shuttle Discovery got a chance to work with some of the equipment they will be taking to space. Flight commander Eileen Collins and her crew were at NASA's Kennedy Space Center, Fla., for the Payload Crew Equipment Interface Test.

The Return to Flight mission of the Space Shuttle (STS-114) is targeted for launch during a window from May 15 to June 3. Returning the Shuttle to flight and completing the International Space Station are the first steps in the Vision for Space Exploration, a stepping-stone strategy toward new exploration goals. STS-114 is the first of two test flights following the Columbia accident. The seven-member Discovery crew will fly to the Station to evaluate procedures for flight safety, including orbiter inspection and repair techniques, and will deliver much-needed supplies.

The astronauts performed tests today to ensure the equipment for the mission's three spacewalks worked properly, and they inspected the cargo containers installed in the Italian-built Multi-Purpose Logistics Module, called Raffaello. They performed fit checks on the Thermal Protection System (TPS) repair sample box, the Control Moment Gyro (CMG), and the External Stowage Platform-2 (ESP2).

The sample box contains pieces of the Shuttle's heat-shielding tile. The samples will enable the crew to test new on-orbit repair techniques recommended by the Columbia Accident Investigation Board.

The new gyroscope will replace an inoperable one on the International Space Station. CMGs provide attitude control for the Station, keeping it properly positioned in space. The ESP2, similar to a large toolbox, will carry replacement parts to the Station. The platform will be deployed, attached to the Station's airlock and used as a permanent spare parts facility.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

ANN's Daily Aero-Linx (04.14.24)

Aero Linx: Soaring Safety Foundation (SSF) The Soaring Safety Foundation (SSF) is the Training and Safety arm of the Soaring Society of America (SSA). Our mission is to provide ins>[...]

Classic Aero-TV: 'We're Surviving'-- Kyle Franklin Describes Airshow Life 2013

From 2013 (YouTube Version): Dracula Lives On Through Kyle Franklin... and We're NOT Scared! ANN CEO and Editor-in-Chief, Jim Campbell speaks with Aerobatic and airshow master, Kyl>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC