Ariane 5 Is Ready To Receive Its Galileo Satellites | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne-Unmanned w/AUVSI-
Tuesday

Airborne Unlimited-
Wednesday

AMA Drone Report-
Thursday

Airborne Unlimited-
Friday

Airborne On ANN

Airborne Unlimited-02.11.19

Airborne Unmanned-02.12.19

Airborne Unlimited-02.13.19

AMA Drone Report-02.14.19

Airborne Unlimited-02.15.19

Airborne-YouTube

Airborne Unlimited-02.11.19

Airborne Unmanned-02.12.19

Airborne Unlimited-02.13.19

AMA Drone Report-02.14.19

Airborne Unlimited-02.15.19

Tue, Jul 03, 2018

Ariane 5 Is Ready To Receive Its Galileo Satellites

Launch By Arianespace Planned For July

The next Ariane 5 launcher to orbit Galileo navigation satellites has completed its initial build-up in French Guiana, continuing preparations for Arianespace’s July mission – which is designated Flight VA244 in the company’s numbering system.

This heavy-lift vehicle underwent its assembly process inside the Spaceport’s Launcher Integration Building, beginning with the mating of its two solid propellant strap-on boosters and the core cryogenic stage. The next steps were the launcher’s vehicle equipment bay integration atop the core stage, followed by installation of the storable propellant stage – which is the configuration used on this Ariane 5 ES version of Arianespace’s workhorse launcher.

After completion of verifications and systems checkout by ArianeGroup, production prime contractor the launcher, Ariane 5 will be moved to the Spaceport’s Final Assembly Building for integration of its four-satellite payload of Galileo FOC (Full Operational Capability) satellites.

A dispenser system will secure the four Galileo FOC satellites in place during their ascent to a targeted release in a circular medium Earth orbit (MEO) using a pyrotechnic separation system.

As Europe’s own global navigation satellite system, Galileo is operated under civilian control, offering guaranteed high-precision positioning around the world. Its initial services began in December 2016, allowing users equipped with Galileo-enabled devices to combine Galileo and GPS data for better positioning accuracy.

The European GNSS Agency (GSA) is responsible for operating the Galileo satellite navigation systems on behalf of the European Union. Galileo spacecraft are built by OHB System in Bremen, Germany, and the navigation payloads provided by Airbus-owned Surrey Satellite Technology in the United Kingdom.

(Source: Arianespace news release. Image provided)

FMI: www.arianespace.com

Advertisement

More News

Aero-News: Quote of the Day (02.17.19)

"I am excited to lead the Air Force Association and absolutely dedicated to supporting AFA's mission of promoting a dominant Air Force and a strong national defense. General Spence>[...]

ANN FAQ: Getting The Word Out

Things To Know When You Send A News Release Aero-News gets hundreds of releases every week, ranging from industry giants like Boeing and Cessna to the smallest of flying clubs and >[...]

ANN's Daily Aero-Term (02.17.19): Ground Communication Outlet (GCO)

Ground Communication Outlet (GCO) An unstaffed, remotely controlled, ground/ground communications facility. Pilots at uncontrolled airports may contact ATC and FSS via VHF to a tel>[...]

ANN's Daily Aero-Linx (02.17.19)

Aero Linx: Cloud Nine Rescue Flights Cloud Nine Rescue Flights aims to eliminate the euthanasia of pets in the United States and provide aid to animals worldwide. We do this by pro>[...]

Bell 407GXi Certified In China

Allows For Deliveries To Begin Immediately The Bell 407GXi light single helicopter has received type certification from the Civil Aviation Administration of China (CAAC). Outfitted>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2019 Web Development & Design by Pauli Systems, LC