Grant Approved For Repair Work At Paine Field | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Sep 20, 2011

Grant Approved For Repair Work At Paine Field

Most Recent Grant Is For $8.2 Million For Improvements To Runway Infrastructure

Snohomish County in Washington State has received an $8.2 million federal grant for repair work at the county’s Paine Field Airport. With approval Friday by County Executive Aaron Reardon and the County Council, the federal Airport Improvement Grant from the FAA will be used to repair the paved shoulders along the main runway by installing edge drains, repaving the shoulders, and installing a new electrical duct bank system.

The existing electrical system is more than 50 years old, and this work will bring the runway edge lighting and signage in line with FAA standards. “Thousands of Snohomish County jobs depend on keeping Paine Field’s main runway in top shape,” said Snohomish County Executive Aaron Reardon. “It is a key part of this state’s aerospace industry.”

“This grant will allow critical upgrades and repairs to our facilities at Paine Field, assuring it remains a world class center for aviation and our aerospace industry,” said Dave Somers, chair of the Snohomish County Council.

Runway 16R-34L is the main jet runway at Paine Field and is the only runway that supports the large aircraft manufactured by Boeing as well as aircraft refurbished at Aviation Technical Services (ATS). County executives say the project is necessary in order to meet FAA design standards and has been identified as a top priority for the county airport.

Combined with $11 million received in 2009 from federal American Recovery and Reinvestment Act (ARRA) funds, the airport will nearly complete an overhaul of the airport’s main runway and taxiway system.

FMI: www.co.snohomish.wa.us

Advertisement

More News

ANN's Daily Aero-Linx (04.17.24)

Aero Linx: Space Medicine Association (SMA) The Space Medicine Association of the Aerospace Medical Association is organized exclusively for charitable, educational, and scientific>[...]

ANN's Daily Aero-Term (04.17.24): Jamming

Jamming Denotes emissions that do not mimic Global Navigation Satellite System (GNSS) signals (e.g., GPS and WAAS), but rather interfere with the civil receiver's ability to acquir>[...]

ANN's Daily Aero-Linx (04.18.24)

Aero Linx: Warbirds of America The EAA Warbirds of America, a division of the Experimental Aircraft Association in Oshkosh, Wisconsin, is a family of owners, pilots and enthusiasts>[...]

Aero-News: Quote of the Day (04.18.24)

"From New York to Paris, this life-size replica of the Webb Telescope inspired communities around the world and, in doing so, invited friends and families to explore the cosmos tog>[...]

ANN's Daily Aero-Term (04.18.24): Hold-In-Lieu Of Procedure Turn

Hold-In-Lieu Of Procedure Turn A hold-in-lieu of procedure turn shall be established over a final or intermediate fix when an approach can be made from a properly aligned holding p>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC