Boeing Delivers 6th Production P-8A Poseidon Aircraft To US Navy | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 05.18.15

Airborne 05.19.15

Airborne 05.20.15

Airborne 05.21.15

Airborne 05.15.15

Airborne Hi-Def On YouTube

Airborne 05.18.15

Airborne 05.19.15

Airborne 05.20.15

Airborne 05.21.15

Airborne 05.15.15

 

Tue, Feb 05, 2013

Boeing Delivers 6th Production P-8A Poseidon Aircraft To US Navy

Final Delivery Of The First Production Lot

The sixth production P-8A Poseidon aircraft was delivered by Boeing to the U.S. Navy Jan. 31, successfully completing the first group of low-rate initial production aircraft that are dramatically improving the service's maritime patrol capabilities. The delivery is the final aircraft from a contract awarded in January 2011. Boeing is on schedule to build 24 P-8A maritime patrol aircraft as part of contracts awarded in 2011 and 2012.

"The P-8 team continues to incorporate efficiencies into our production as we ramp up deliveries in 2013," said Rick Heerdt, Boeing vice president and P-8 program manager. "We've reduced flow times and costs, which ultimately benefits our U.S. Navy customer."
 
The U.S. Navy plans to purchase 117 P-8As, which are based on the Next-Generation Boeing 737-800 platform. It is a versatile multi-mission aircraft that provides broad long-range maritime patrol capabilities -- anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance. It is replacing the U.S. Navy's P-3 fleet.
 
"This aircraft delivery marks the beginning of a new era of maritime patrol aircraft," said Capt. Scott Dillon, Maritime Patrol and Reconnaissance Aircraft program manager. "The first fleet squadron is now equipped with P-8s, and will soon deploy with a maritime patrol capability that is greatly enhanced relative to our legacy P-3 force."
 
The next three Poseidon aircraft are undergoing mission systems installation and checkout in Seattle, and two more are in final assembly in Renton, WA. Boeing will deliver its seventh production P-8A to the Navy later this quarter.
 
As part of the LRIP contracts, Boeing is also providing maintenance training for the Navy, in addition to logistics support, spares, support equipment and tools.

(Image provided by Boeing)

FMI: www.boeing.com

Advertisement

More News

Airborne 05.20.15: HondaJet Update, Latitude Exceeds, Turbonormalized P210

Also: Airplane Swap Stymied, Oshkosh Veterans, Boeing Hiring, National Aviation Symposium, Airlines for America, Another Stolen Airplane, WAI's New Board Members The Honda Aircraft>[...]

FAA Issues Emergency AD For Avidyne

Avidyne IFDs Found To Have Displayed Incorrect Course Deviation Indication Information During GPS Approaches The latest Emergency AD to be issued by the FAA has involved the new ge>[...]

ANN's Daily Aero-Linx (05.21.15)

Association for Women in Aviation Maintenance This nonprofit organization was formed to champion women's professional growth and enrichment in the aviation maintenance fields.>[...]

ANN's Daily Aero-Term (05.21.15): Flat Rated

Propulsion engine capable of giving full thrust or power for take-off at an airfield well above S/L and/or at high ambient temperature (thus, probably derated at S/L).>[...]

Aero-News: Quote Of The Day (05.21.15)

“Communities of all sizes, in every corner of the country, are depending on you to retain your oversight authority in the areas of taxes and access, to ensure that the public>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC