Boeing Delivers 6th Production P-8A Poseidon Aircraft To US Navy | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 08.29.14 ** HD iPad-Friendly -- Airborne 08.29.14 **
** Airborne 08.27.14 ** HD iPad-Friendly -- Airborne 08.27.14 **
** Airborne 08.25.14 ** HD iPad-Friendly -- Airborne 08.25.14 **

Tue, Feb 05, 2013

Boeing Delivers 6th Production P-8A Poseidon Aircraft To US Navy

Final Delivery Of The First Production Lot

The sixth production P-8A Poseidon aircraft was delivered by Boeing to the U.S. Navy Jan. 31, successfully completing the first group of low-rate initial production aircraft that are dramatically improving the service's maritime patrol capabilities. The delivery is the final aircraft from a contract awarded in January 2011. Boeing is on schedule to build 24 P-8A maritime patrol aircraft as part of contracts awarded in 2011 and 2012.

"The P-8 team continues to incorporate efficiencies into our production as we ramp up deliveries in 2013," said Rick Heerdt, Boeing vice president and P-8 program manager. "We've reduced flow times and costs, which ultimately benefits our U.S. Navy customer."
 
The U.S. Navy plans to purchase 117 P-8As, which are based on the Next-Generation Boeing 737-800 platform. It is a versatile multi-mission aircraft that provides broad long-range maritime patrol capabilities -- anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance. It is replacing the U.S. Navy's P-3 fleet.
 
"This aircraft delivery marks the beginning of a new era of maritime patrol aircraft," said Capt. Scott Dillon, Maritime Patrol and Reconnaissance Aircraft program manager. "The first fleet squadron is now equipped with P-8s, and will soon deploy with a maritime patrol capability that is greatly enhanced relative to our legacy P-3 force."
 
The next three Poseidon aircraft are undergoing mission systems installation and checkout in Seattle, and two more are in final assembly in Renton, WA. Boeing will deliver its seventh production P-8A to the Navy later this quarter.
 
As part of the LRIP contracts, Boeing is also providing maintenance training for the Navy, in addition to logistics support, spares, support equipment and tools.

(Image provided by Boeing)

FMI: www.boeing.com

Advertisement

More News

Annual Oshkosh 2014 'Best/Worst Of' Award Selection Invites YOUR Participation!

YOU Can Contribute To The Annual List Compiled By The Staff and Readership of the ANN and Aero-TV! E-I-C Note: We're going to start naming names and dropping details THIS week--- t>[...]

Airborne 08.29.14: Google Drone!, Cessna's 10,000th, Bearhawk LODA

Also: Big Boeing Order, Napa Tower Quaked, Landsberg Retires, Galileo Falters Breaking News! Google has unveiled an exciting new UAV project, called Project Wing, which has been un>[...]

Aero-TV: The Tecnam Juggernaut -- SeaSky, P2008, P2010, Trainers, and Astore!

An Impressive Line-Up Continues To Make A Solid Impact On Sport Aviation ANN CEO and Editor-In-Chief, Jim Campbell seized the opportunity to talk with Phil Solomon, the CEO of Tecn>[...]

AD: Bombardier, Inc. Airplanes

AD NUMBER: 2014-17-04 PRODUCT: Certain Bombardier, Inc. Model CL-600-2B19 (Regional Jet Series 100 & 440) airplanes.>[...]

ANN's Daily Aero-Linx (09.02.14)

FAA General Aviation Airports Report Beginning in 2010, the FAA began a national review of the general aviation airports resulting in two reports, General Aviation Airports: A Nati>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC