Sat, Dec 15, 2012
Two Instances Of Engine Fires Prompted The Move
The FAA posted a proposed AD in the Federal Register Thursday for all General Electric Company (GE) CF34-8C and CF34-8E turbofan engines with certain part numbers (P/N) of operability bleed valves (OBV) installed. This proposed AD was prompted by three failure events of ring lock fuel fittings on the OBV. Two of those events led to an engine fire. This proposed AD would require the affected OBVs be removed from service and replaced with OBVs eligible for installation. The FAA is proposing this AD to prevent failure of OBV ring lock fuel fittings, engine fuel leakage, uncontrolled fire, and damage to the airplane.
The agency received reports of three failure events of OBV ring lock fuel fittings on GE CF34-8C turbofan engines. Two of those events led to an engine fire. Investigation revealed that the ring lock fittings failed due to fatigue caused by improper broaching of the OBV housing during manufacture, and, improper installation of the ring lock fittings during OBV assembly. GE CF34-8E turbofan engines also use the affected OBVs and would be affected by this proposed AD.
The FAA says that this condition, if not corrected, could result in failure of OBV ring lock fuel fittings, engine fuel leakage, uncontrolled fire, and damage to the airplane.
The repairs are expected to affect some 300 engines installed on Embraer and Bombardier airplanes of U.S. registry. The FAA estimates that it would take about two hours per engine to perform the actions required by this proposed AD, and that the average labor rate is $85 per hour. Required parts would cost about $25,000 per engine. Based on these figures, we estimate the total cost of the proposed AD to U.S. operators to be $7,551,000.
Comments on the proposed AD are due to the FAA by February 11, 2013.
More News
Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]
"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]
Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]
Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]
Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]