ISS-10 Status Report | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Nov 14, 2004

ISS-10 Status Report

Canadarm2 practice, science experiments and maintenance work on the agenda

Expedition 10 Commander Leroy Chiao this week extended his reach beyond the confines of the pressurized compartments of the International Space Station as he and Flight Engineer Salizhan Sharipov near the one month mark in space since launch October 14.

As is the case with every Station crew, practice sessions with the station's 58-foot robotic arm - Canadarm2 - are scheduled early in the increment to exercise the arm and provide practical training for astronauts. Monday, Chiao, in the Destiny Laboratory, used the arm to provide engineers in the Mission Evaluation Room of Mission Control video of a protective panel on the outside the module. A possible indentation was seen there in imagery from the most recent Space Shuttle mission to the Station in November 2002 (STS-113/11A).

Chiao positioned the arm so that cameras could zoom in on the area. The video helped engineers determine that the indentation was not caused by a micrometeoroid or debris strike. The flat spot on the lab shield appeared to be similar to flattened areas seen in shields on the Unity module.

Engineering analysis of the imagery showed these flat spots can occur on the forward and aft triangles of the shields possibly as the result of temperature changes. The shields' protective function and fit is not affected.

Earlier today, Chiao again took command of the robot arm and moved it into position to allow its cameras to view the relocation of the crew's Soyuz spacecraft, a maneuver scheduled for November 29. The crew will fly the Soyuz from the Pirs Docking Compartment to a docking port on the Zarya Control Module. The move will clear the Pirs module for two Russian spacewalks in 2005.

While the crew continued routine housekeeping and exercise chores, scientific research work continued as well. The focus of attention this week was the Binary Colloidal Alloy Test (BCAT), which investigates long-term behavior of particles suspended in various liquids such as ink, paint and milk, in microgravity. Chiao worked with the experiment twice this week to assist investigators in determining what types of colloids should be studied by future crews. Ultimately, the data could help in development of new products for the communications and computer industries.

At midweek, Chiao tried to fix a faulty US spacesuit pump that caused a lack of cooling as discovered in testing during Expedition 9 earlier this year. The work was halted when a small washer-shaped shim could not be found. Flight controllers ended the search Thursday and will evaluate the next course of action. The US suits are not scheduled for use until Space Shuttle flights resume. A new shim may be delivered to the Station aboard the next Progress resupply craft in December.

On Thursday, a circuit breaker tripped aboard the Station that had been powering several pieces of crew equipment. The circuit breaker remains off while the crew and ground teams plan to check the equipment that had been powered. The equipment includes a laptop, the cycle ergometer and a light. Those items will be tested to ensure no problems with them caused the breaker to trip. Today, the crew took photos of the setup for engineers on the ground.

Among activities next week will be a reboost of the Station's altitude, a maneuver performed periodically to maintain the complex's orbit. Information on the crew's activities aboard the Space Station, future launch dates, as well as Station sighting opportunities from anywhere on the Earth, is available on the Internet on the FMI link below.

FMI: http://spaceflight.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC