Pratt & Whitney PurePower PW1500G Engine Begins Flight Test Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** AIRBORNE 06.18.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 06.18.13 **

** AIRBORNE 06.14.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 06.14.13**

** AIRBORNE 04.01.13 SPECIAL EDITION of Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 04.01.13 SPECIAL EDITION **

Thu, Jun 23, 2011

Pratt & Whitney PurePower PW1500G Engine Begins Flight Test Program

Maiden Flight Conducted On Modified 747SP From Mirabel, Quebec

Pratt & Whitney said Tuesday that its PW1500G engine took to the skies for its first flight on June 20, launching the engine family's first flight test program. The PW1524G engine for the Bombardier CSeries aircraft flew its maiden flight on Pratt & Whitney's 747SP flying test bed at Pratt & Whitney Canada's Mirabel Aerospace Centre, in Mirabel, Quebec (Canada). Open since May 6, this state-of-the-art facility, which features advanced manufacturing technologies, is where final production assembly and test will occur for both the PurePower PW1524G and P&WC's advanced PurePower PW800 family of engines for the next generation of large business jets.

"The engine performed even better than we expected on this first flight, building on the success of our ground test program," said Bob Saia, vice president, Next Generation Product Family. "To date, we have conducted nearly 400 hours of full engine ground testing. We are very pleased with the initial results, which have demonstrated the geared architecture's benefits of low fuel consumption, lower noise and a robust operational design. The engine is real, and it's flying now. We have four PurePower engines at test and five engines in the build phase."  This initial flight test program validates performance, engine operability and in-flight starting. 

In addition to full engine testing, Pratt & Whitney has performed critical part level and engine sub-system testing to validate designs for the PurePower engine program, including design validation of the Fan Drive Gear System, fan blade for bird ingestion and blade containment and compressor performance for the advanced PW1000G core.

The PurePower PW1000G series engines use an advanced gear system allowing the engine's fan to operate at a different speed than the low-pressure compressor and turbine. The combination of the gear system and an all-new advanced core are expected to deliver double-digit improvements in fuel efficiency, environmental emissions and noise.

The PW1500G engine test program will run a total of eight test engines over the next 18 months with engine certification scheduled for 2012. Entry into service is scheduled for 2013.

The day after the first flight, Pratt & Whitney announced that it had received commitments for the engine on 10 firm and up to 6 option CS100 CSeries aircraft ordered by an undisclosed major network carrier. The deal represents 20 firm PW1500G series engines covered by a PureSolution maintenance service agreement.

FMI: www.utcaero.com
 

Advertisement

More News

Lufthansa Firms Up Order For 100 A320 Family Aircraft

German Airline The Largest Airbus Customer And Operator In Europe The Lufthansa Group has firmed up a previous Supervisory Board decision from March this year and signed for 100 A3>[...]

Airborne 06.18.13: Reno Race Shakeup, A350 XWB First Flight, Great Lakes Flies!

Also: Beechcraft Not Happy With GAO, More Damage to GA From FAA, Cessna 172 SAIB, An Inspirational Leap The inability to reach agreement over a number of unsettled restrictions, in>[...]

FAA Requires Operation Migration Pilots To Hold Private Licenses

New Aircraft To Be Purchased With Support From Donors New airplanes will lead endangered whooping cranes from their summer range to Florida for the winter in coming years, and the >[...]

ANN's Daily Aero-Linx (06.18.13)

International Federation of Air Traffic Controllers IFATCA is a worldwide organization representing more than fifty thousand air traffic controllers in 134 countries.>[...]

ANN's Daily Aero-Term (06.18.13): One-Hundred-Hour Inspection

A complete inspection that is required for all aircraft operated for hire every 100 hours.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2013 Web Development & Design by Pauli Systems, LC