Aero-TV: 'The Worst Rule Making' -- AEA's Ric Peri On The Part 145 Proposal | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 11.21.14 ** HD iPad-Friendly -- Airborne 11.21.14 **
** Airborne 11.19.14 ** HD iPad-Friendly -- Airborne 11.19.14 **
** Airborne 11.17.14 ** HD iPad-Friendly -- Airborne 11.17.14 **

Thu, Nov 08, 2012

Aero-TV: 'The Worst Rule Making' -- AEA's Ric Peri On The Part 145 Proposal

The Worst Proposal He's Seen, AEA's Washington Expert Warns About The Perils Of The Part 145 Re-Write

We've devoted a lot of verbiage to the topic... but as more and more of the details of FAA's current Part 145 proposal emerge, we're wondering if we've underplayed it. Short and sweet, the current version of FAA's part 145 Rule-Making is just plain bad news.

For instance... The rule proposes a 24-month transition period to reissue new certificates, and there is no implementation period. With the current lack of FAA workforce and sequestration initiatives, how will the agency approve and reissue certifications to 4,000 repair stations in a 24-month period? Without the FAA's ability to service an application in a timely manner, businesses will close.
 
Contrary to the FAA's claim, this proposal does not reflect current repair station aircraft maintenance and business practices, or advances in aircraft technology. It simply does not recognize avionics as a profession. These changes would not modernize the regulations to keep pace with current industry standards and practices. Rather, they would roll modern aviation back to the days of round motors and tube radios from the 1930s.
 
The AEA has received second-hand information that various user groups, as well as certain FAA inspectors, have incorrectly assumed and promoted that the Part 145 NPRM proposal only applies to repair stations that cater to Part 121 air carriers. This is not true and is disturbing. This proposal applies to all repair stations regardless of its customer bases.

There's more... but we'll let AEA's Peri fill you in, on the subject, better than anyone we know...

Copyright 2012, Aero-News Network, Inc., All Rights Reserved.

FMI: www.aea.net, www.aea.net/part145, www.aero-tv.net, www.youtube.com/aerotvnetwork, http://twitter.com/AeroNews

 


Advertisement

More News

Airborne 11.21.14: AEA's 3Q/14 Report, Fantasy Of Flight, Modernizing The NAS

Also: Holland Wants Gold, FAA Strangling UAVs?, RAF WWII Trainer For Sale, Bf109s Live, Georgia v Aerospace Engineers The Aircraft Electronics Association has released its third-qu>[...]

Aero-News: Quote Of The Day (11.23.14)

"Reaching this stage that we call ATLO is a critical milestone. This is a very satisfying point of the mission as we transition from many teams working on their individual elements>[...]

ANN FAQ: Getting The Most Out Of ANN's Newsletters

ANN goes through a lot of trouble to make the graphics flashy and cool and an integral part of the story. But let's face it, they're bandwidth-intensive. So here are a couple of th>[...]

Air Force Funds Research On Thermal Management Technology For Fighters

Heat Generated By Electronic Systems A Growing Challenge Managing heat that is generated by electronic subsystems in next-generation aircraft is a vexing challenge for aerospace sy>[...]

Raytheon Successfully Demonstrates Airborne Electronic Attack System

Prototype Test Flights Evaluate Integrated Electronic Warfare Capabilities The U.S. Navy and Raytheon successfully demonstrated an end to end, first of its kind, integrated electro>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC