Official DOD Statement on Lockheed Martin Win of VXX Contract | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** AIRBORNE 05.24.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.24.13 **

** AIRBORNE 05.21.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.21.13 **

** AIRBORNE 04.01.13 SPECIAL EDITION of Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 04.01.13 SPECIAL EDITION **

Fri, Jan 28, 2005

Official DOD Statement on Lockheed Martin Win of VXX Contract

Statement: Lockheed Martin to Build New Presidential Helicopter

The Department of Defense announced today that the team led by Lockheed Martin Systems Integration, Owego, N.Y., has been selected to build the new presidential helicopter (VXX) based on its U.S. 101 medium lift helicopter.

This $1.7 billion, cost plus award fee contract will launch the VXX program’s system development and demonstration phase during which the program will integrate a “system of systems” with a modern, in-production aircraft to provide the president with safe and reliable helicopter transportation.
 
“Today’s announcement is a significant milestone that caps an exhaustive and deliberative source selection process that carefully followed the Federal Acquisition Regulations,” said John Young, assistant secretary of the Navy for research, development and acquisition. “The determined effort, long hours and hard work by both the VXX government team and the two industry teams will ensure a high level of quality and safety for future presidents, as well as a timely, efficient and effective program execution.”

“This decision truly reflects the best value and capability for the American taxpayer who is funding it, the Marines who will operate it and the future presidents who will fly in it,” Young added.

The fleet of helicopters that currently supports the presidential mission includes 30-year old aircraft that were designed in the 1960’s, fielded in the 1970’s and no longer has the growth capability to incorporate the equipment necessary to provide suitable presidential support in the post 9-11 environment.

“Under this replacement program, with its technology and performance improvements, a single platform will provide better savings in total ownership costs, engineering, maintenance and logistical support over the lifetime of the program,” Young said. “The president needs a more survivable helicopter while the nation engages in the Global War on Terrorism, and we are committed to providing it as soon as possible.”

The original Presidential Helicopter Replacement Program of record proposed an initial operating capability in 2013. The VXX program was accelerated in 2003 with a currently planned IOC in fiscal year 2009.

FMI: www.defenselink.mil

Advertisement

More News

ANN's Daily Aero-Linx (05.24.13)

Stormbirds A confederation of Luftwaffe-related web sites, providing reference-grade coverage of the Messerschmidt 262 and other advanced combat aircraft of the Third Reich.>[...]

ANN's Daily Aero-Term (05.24.13): Terrain/Obstruction Alert

A safety alert issued by ATC to aircraft under their control if ATC is aware the aircraft is at an altitude which, in the controller's judgment, places the aircraft in unsafe proxi>[...]

Aero-News: Quote Of The Day (05.24.13)

"You have a huge job ahead of you. The challenges are many and the solutions are hard." Source: Senate Commerce Committee Chair Jay Rockefeller (D-WV).>[...]

ANN FAQ: ANN's News Portal Syndication Program

Get A Customized ANN News Portal For YOUR Website! As we promised, the ever-so-busy software geeks at ANN have been working overtime on a number of cool new tools and toys... and t>[...]

AF Seven Summits Team Scales Everest

Effort To Raise Funds And Awareness For The Special Operations Warrior Foundation A group of Airmen with the Air Force Seven Summits team reached the highest point of the world, Mo>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2013 Web Development & Design by Pauli Systems, LC