Rolls-Royce Provides Trent 1000 Package C Update | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Apr 17, 2018

Rolls-Royce Provides Trent 1000 Package C Update

Engine Powers About 25 Percent Of Boeing's Dreamliner Fleet

In its 2017 Full Year results released on March 7, 2018, Rolls-Royce outlined its management of certain Trent 1000 engine in-service issues and the estimated costs relating to the implementation of the solutions to address those issues.

As part of the company's ongoing inspection and testing of those engines, it has identified a need to carry out additional engine inspections to those previously planned. The increased inspection frequency is driven by the further understanding of the durability of the Trent 1000 Package C compressor, a condition that was highlighted earlier this year. These inspections will be supported by service management and flight operations guidance to airlines to be issued by the airworthiness authorities.

This will unfortunately lead to additional disruption for Rolls-Royce customers. There are 380 Package C engines currently in-service with airlines. This new regime does not impact Trent 1000 Package B engines or Trent 1000 TEN engines.

While the compressor technical issue was known at the time of the results, the requirement for more regular inspections will lead to higher than previously guided cash costs being incurred during 2018. Rolls-Royce is reprioritizing various items of discretionary spend to mitigate these incremental cash costs and our guidance for 2018 FCF remains unchanged at Group FCF for 2018 of around $645 million +/- $143 million.

"Our focus is on supporting our customers and doing all we can to minimise any impact on their operations," said Warren East, CEO, Rolls-Royce. "We sincerely regret the disruption this will cause to our customers and our team of technical experts and service engineers is working around the clock to ensure we return them to full service as soon as possible. We will be working closely with Boeing and affected airlines to minimise disruption wherever possible.”

About 25 percent of the 787 Dreamliner fleet is powered by this Rolls-Royce engine variant. This issue does not affect current production 787s, the Trent 1000 Package B, Trent 1000 TEN or GEnx-1B engines.

Boeing said in a statement that an existing EASA Airworthiness Directive for the Package C engine requires inspections of an intermediate pressure compressor blade at certain flight cycles. If a durability issue is found, the blade will be replaced. This is a known issue and we will continue to work with Rolls-Royce, our customers and the regulators to fully resolve it. Boeing is deploying support teams to mitigate service disruption.

"Safety is our highest priority. The 787 has safely flown more than 3.2 billion miles since entering commercial service in 2011," the planemaker said.

(Source: Rolls-Royce and Boeing news releases. Image from file)

FMI: www.rolls-royce.com, www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

ANN's Daily Aero-Linx (04.14.24)

Aero Linx: Soaring Safety Foundation (SSF) The Soaring Safety Foundation (SSF) is the Training and Safety arm of the Soaring Society of America (SSA). Our mission is to provide ins>[...]

Classic Aero-TV: 'We're Surviving'-- Kyle Franklin Describes Airshow Life 2013

From 2013 (YouTube Version): Dracula Lives On Through Kyle Franklin... and We're NOT Scared! ANN CEO and Editor-in-Chief, Jim Campbell speaks with Aerobatic and airshow master, Kyl>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC