G Systems Delivers NASA Orion Test Stations | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Mar 01, 2010

G Systems Delivers NASA Orion Test Stations

Equipment To Collect, Store, And Analyze Data, Mission Unclear

Changes in NASA's budget, which seem to shift the focus of manned spaceflight to private companies, notwithstanding ... G Systems, which is a test and measurement automation company specializing in challenging data acquisition requirements, delivered its first system for a new Orion crew exploration vehicle test station at NASA's Michoud Assembly Facility in New Orleans, Louisiana. Lockheed Martin, the prime contractor to NASA for Orion, awarded G Systems three contracts valued at over $1 million as part of a multi-phase delivery plan to design, integrate, and install an automated data acquisition and analysis test station for Orion by June 2010. The test stations will provide critical data to ensure structural endurance and spacecraft safety.

G Systems' first system, the Data Acquisition System (DAS), will be used at the Orion Structural Test Facility (OSTF) to view, collect, store, analyze, and transfer data from more than 1,400 analog data channels. Primary data input will be from strain gauges applied to the Orion Crew Module, Service Module (SM), Launch Abort System Fairing Assembly (LASFA), and heat shield structures during ground testing. The G Systems designed DAS will collect stress data such as torque, strain, and pressure to simulate and measure the effects the Orion spacecraft will experience during take-off, space flight, and re-entry.

The second test and measurement system, the Data Distribution System (DDS), includes hardware and custom software to collect, distribute, and analyze audio, video, and parametric data collected by the DAS. The DDS will be capable of receiving streaming, real-time test data from greater than 3,500 data channels. The DDS will also control a number of cameras and be able to record, display, and playback all acquired signals simultaneously on multiple client PCs via a network.

The third test system provided by G Systems is a computerized pressure and vent system which integrates with the DAS for pressure testing the Crew Module. This system is capable of pressurizing the cabin using either air or helium. The tool also includes an operator control terminal for setting and regulating pressure and monitoring temperature.

G Systems will provide complete test systems that include hardware and software design, fabrication, system integration, training, and support acceptance testing at the Michoud Assembly Facility.

"These Orion test systems will take advantage of G Systems' extensive experience in cost-effectively delivering complex high channel count test systems requiring time-synchronized data acquisition and analysis," said Doug Kibler, G Systems' Senior Sales Manager. "The new system provides NASA and Lockheed Martin a robust platform for stress testing with precision measurements and data management."

FMI: www.gsystems.com


Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC