Update: 747-8 First Flight Completed Successfully | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Feb 08, 2010

Update: 747-8 First Flight Completed Successfully

New Cargo Variant Completed Taxi Tests, Ready To Fly

ANN RealTime Update -- 02.08.10, 1918 EST: The Boeing 747-8 has completed a lengthy first flight after a nearly three hour delay due to low ceilings. Current reports indicate that the flight went "very well."

ANN RealTime Update -- 02.08.10, 1538 EST: Boeing 'RC501' the first 747-8, has departed Paine Field's Rwy 34L for an inaugural test flight and has been cleared for an unrestricted climb to 10,000 feet, where it has been assigned an altitude block for initial flight test investigations... ANN will monitor and furnish details throughout the day...

ANN RealTime Update -- 02.08.10, 1523 EST: The first flight of the 747-8 is imminent. WX conditions have improved dramatically with a solid 10 mile visibility and a scattered deck at 900 feet. The aircraft, "Boeing 501 Heavy Experimental," is now taxiing for takeoff on Rwy 34L...

ANN RealTime Update -- 02.08.10, 1353 EST: Current wx observations show IFR conditions at Paine Field.  Winds are calm, with a 500 foot overcast and 8 mile visibility.

Temp is 46 degrees-F and Dewpoint is 43 degrees-F. Altimeter is 30.06. The forecast calls for winds variable at 3 kts, visibility greater than 6 SM, scattered clouds at 1200', and broken clouds at 6000' by 1300 PST.

ANN RealTime Update -- 02.08.10, 1300 EST: Low ceilings are delaying the first flight of the massive Boeing 747-8. Forecasts do hold out some hope for gradual improvements later in the day so the possibility of a first flight still exists. Current conditions show about a 200 foot ceiling with 8 mile visibility and light winds from the South. There is no estimation, as yet, for a possible rescheduling of the flight.

Original Report: The first flight test of the Boeing 747-8 is slated for Monday, February 8, 2010.  The first flight window will open 10:00am PDT.

Pilots of the 747-8 Freighter first flight will be Capt. Mark Feuerstein, 747 Chief Pilot, and Capt. Tom Imrich, Senior Test Pilot 747 Program.

Boeing completed taxi tests on the first 747-8 Freighter on February 6. Feuerstein took the airplane to a top speed of approximately 90 knots.  That was the last functional test planned before first flight.

 

"The airplane performed well," said Mo Yahyavi, 747 program vice president and general manager, Boeing Commercial Airplanes.

“Based on early indications, the airplane is ready to fly."

A live webcast of the 747-8 Freighter takeoff and landing will be available.

FMI: www.747-8firstflight.com

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC