USAF Study Determining C-5A's Viability | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** AIRBORNE 06.18.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 06.18.13 **

** AIRBORNE 06.14.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 06.14.13**

** AIRBORNE 04.01.13 SPECIAL EDITION of Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 04.01.13 SPECIAL EDITION **

Thu, Dec 11, 2003

USAF Study Determining C-5A's Viability

USAF Jumbo Showing Its Age?

Experts at Warner-Robins AFB are evaluating the C-5 Galaxy's current health, service life and long-term viability as the first phase of an on-going study to decide the aircraft’s future.

The four-phase C-5A Structural Risk Analysis and Model Revalidation study began here at the request of Air Mobility Command officials.

"We're going to provide a quick look at the C-5's status, and AMC (officials) will use that information to see if the C-5 is a good candidate for future investment and upgrades," said Col. Frank Bruno, strategic airlift directorate director. "If our tear-down analysis indicates that the plane is structurally sound, then they may consider it as a future investment. If not, they may be hard-pressed to invest more dollars."

Structural engineers, program managers and others from the strategic airlift and maintenance directorates here have been working fulltime examining the guts of the C-5 aircraft. The C-5, Tail No. 690004, is one of 14 aircraft Air Force officials selected for retirement.

"We're taking a hard look at the skeleton of the plane and trying to determine if there's any damage that hasn't been uncovered before through normal inspections," said Buc McRory, strategic airlift directorate structures engineer and lead engineer for the project. He will determine the plane's structural service life.

This particular C-5 was selected because of its true representation of the fleet, McRory said.

Workers from the nondestructive inspection division of the maintenance directorate are conducting the inspections, and results will be added to an existing model of the plane to compute how long it could continue flying, McRory said.

Although a majority of the tear-down part of the study will not take place until the third phase, some parts are being removed to help the inspection and will be used as spare parts, said Jerry Ethridge. He is the strategic airlift directorate program manager.

The study's four phases are:

  • Phase 1 -- Nondestructive inspection takes place here. Initial results are due to Air Mobility Command by February.
  • Phase 2 -- Planning and gathering of support equipment to tear down the plane. This phase runs through 2004. Components will be sent to an undetermined location later for further disassembly and inspection.
  • Phase 3 -- Tear down and further analysis.
  • Phase 4 -- Remaining parts of the aircraft will be disposed. [ANN Thanks Holly Logan, Warner Robins Air Logistics Center Public Affairs]
FMI: www.af.mil

Advertisement

More News

Aero-TV: Garmin’s GNC-255 –- Back To Basics

Garmin's New Aviation VHF Radios Early this year, a new series of aviation VHF COM and NAV/COM radios, the GTR and GNC series, was announced by Garmin. As the replacement products >[...]

EADS And Siemens Enter Long-Term Research Partnership

Sign MoU With Diamond Aircraft On Electric Propulsion System EADS and Siemens are entering into a long-term research partnership to introduce new electric propulsion systems that c>[...]

ANN's Daily Aero-Term (06.19.13): Ceiling

The heights above the earth's surface of the lowest layer of clouds or obscuring phenomena that is reported as broken, overcast, or obscuration, and not classified as thin or parti>[...]

ANN's Daily Aero-Linx (06.19.13)

The Army Aviation Heritage Foundation The Army Aviation Heritage Foundation (AAHF) is a non-profit public educational foundation dedicated to presenting the Army Aviation story to >[...]

Aero-News: Quote Of The Day (06.19.13)

“The serial electric propulsion allows us to design airplanes with totally different characteristics than today. Vertical take-off and high-speed cruise can be realized in a >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2013 Web Development & Design by Pauli Systems, LC